Statewide Processes
Written By CA eTRM
Last updated About 1 month ago
Addendum Documenting Rebates over IMC/FMC
In Decision D.06-06-063, the CPUC recognized that rebates may exceed Incremental Measure Cost (IMC) or Full Measure Cost (FMC) in limited circumstances. The latest CPUC guidance requires Program Administrators (PAs) to document and justify such cases through a rebate addendum for each measure version. This requirement supports CPUC review and approval of rebate levels that may affect cost-effectiveness calculations and measure reporting.
The procedure below describes how to prepare, document, and submit the addendum.
Process for Addendum Documenting Rebates Over IMC_FMC.pdf
148.6 KBβ’ Document
Documenting CET Run
Since CET run parameters are not automatically transferred from CEDARS to the eTRM, measure developers must document the configuration used for each CET run when uploading output files. This documentation provides a traceable record of the assumptions and inputs used to generate CET results and Restricted Permutation Flag calculations, supporting future review and validation efforts.
Instructions on how to document CET runs for CET output upload and Restricted Permutation Flag calculation
Memo - Upload CET Data 2024-05-01.pdf
263.5 KBβ’ Document
Requesting a change to a Measure Package
Process for requesting a mid-cycle update or administrative correction to approved measure packages
Memo - Measure Package Change Request 2026-05-13.pdf
169.3 KBβ’ Document
Sunsetting a Measure
Process to request, approve, and announce the sunsetting of a measure
Memo - Sunsetting Measures 2026-05-13.pdf
231.8 KBβ’ Document
PA adoption of Statewide Measure Packages
CPUC guidance memo establishing procedures for PA adoption of Statewide Measure Packages
PA-adoption-of-statewide-measure-packages_20220609.pdf
293.3 KBβ’ Document