Statewide Processes

Written By CA eTRM

Last updated About 1 month ago

Addendum Documenting Rebates over IMC/FMC

In Decision D.06-06-063, the CPUC recognized that rebates may exceed Incremental Measure Cost (IMC) or Full Measure Cost (FMC) in limited circumstances. The latest CPUC guidance requires Program Administrators (PAs) to document and justify such cases through a rebate addendum for each measure version. This requirement supports CPUC review and approval of rebate levels that may affect cost-effectiveness calculations and measure reporting.

The procedure below describes how to prepare, document, and submit the addendum.

Process for Addendum Documenting Rebates Over IMC_FMC.pdf

148.6 KBβ€’ Document

Documenting CET Run

Since CET run parameters are not automatically transferred from CEDARS to the eTRM, measure developers must document the configuration used for each CET run when uploading output files. This documentation provides a traceable record of the assumptions and inputs used to generate CET results and Restricted Permutation Flag calculations, supporting future review and validation efforts.

Instructions on how to document CET runs for CET output upload and Restricted Permutation Flag calculation

Memo - Upload CET Data 2024-05-01.pdf

263.5 KBβ€’ Document

Requesting a change to a Measure Package

Process for requesting a mid-cycle update or administrative correction to approved measure packages

Memo - Measure Package Change Request 2026-05-13.pdf

169.3 KBβ€’ Document

Sunsetting a Measure

Process to request, approve, and announce the sunsetting of a measure

Memo - Sunsetting Measures 2026-05-13.pdf

231.8 KBβ€’ Document

PA adoption of Statewide Measure Packages

CPUC guidance memo establishing procedures for PA adoption of Statewide Measure Packages

PA-adoption-of-statewide-measure-packages_20220609.pdf

293.3 KBβ€’ Document